WhatsApp:(+86)18620951155
Phone:(+86)020-29065322
Email:yangst@yangst.com
Address:NZRD56,Lianhu,Shatou,Panyu,GZ
WhatsApp:(+86)18620951155
Phone:(+86)020-29065322
Email:yangst@yangst.com
Address:NZRD56,Lianhu,Shatou,Panyu,GZ
Aluminium has about one third the density of steel. One person can carry the components of a standard-height aluminium scaffold by hand, whereas a steel tube scaffold needs at least two, and moving material between floors takes more labour still. In areas with dense sites and high labour costs such as Shenzhen and Dongguan, aluminium saves about 40% of the labour in handling alone.
| Item | Aluminium scaffold | Steel tube scaffold |
|---|---|---|
| Connection | Cold-formed joint or pin lock, 5 seconds per node | Coupler and bolt, 30 seconds or more per node |
| Erection by one person | About 15 minutes per set (6 m) | About 50 minutes per set |
| Tools required | None - assembled by hand | Spanner to tighten couplers |
| Skill required | Low - follow the instructions | Certified scaffolder |
For projects in Shenzhen areas such as Songgang and Guangming, hours are money. At the same height, aluminium saves more than 60% of the erection time.
Transport: every component of a 6 m aluminium scaffold fits into one small van. A steel tube scaffold at the same height needs at least a light truck. Storage: aluminium packs compactly and takes about one quarter of the space of a steel scaffold.
Aluminium: naturally corrosion resistant, does not rust, suits indoor and outdoor use, needs virtually no maintenance, and a reputable brand gives more than 10 years of normal service.
Steel tube: needs regular descaling and painting, costs about RMB 10-15 per set per year outdoors, and has to be replaced every 3 to 5 years.
| Application | Recommended |
|---|---|
| Indoor fit-out, mall maintenance | Aluminium - light, does not damage floors |
| External wall and main structure | Steel tube - higher load capacity |
| Nuclear plant / clean room | Aluminium - no corrosion, non-magnetic |
| Temporary work at height (1-3 days) | Aluminium - fast to erect and strike |
| Long-term external scaffold (3 months plus) | Steel tube - lower hire cost |
| Item | Aluminium scaffold | Steel tube scaffold |
|---|---|---|
| Purchase cost | About RMB 8,000-15,000 | About RMB 3,000-5,000 |
| Two-year maintenance | About RMB 0 | About RMB 500-1,000 |
| Handling labour | Low - one person | High - two or more |
| Two-year total cost | Approximately the initial outlay | Initial outlay x 1.3-1.5 |
| Service life | More than 10 years | 3-5 years |
| Annualised cost | Lower | Higher |
In the short term steel is cheaper; over the long term aluminium has the lower total cost. For indoor fit-out, mall maintenance and nuclear plant overhaul in Shenzhen, where scaffolds are erected and struck frequently, aluminium scaffolding is the better value choice.