PRODUCTS
Your position:Home >> PRODUCTS >>  Standard Products >>  Custom Assembled

Custom Assembled

WhatsApp:(+086)18620951155

  • 产品描述
  • 产品参数
  • 文档下载
  1.  Assembled on the Steps


    The components of the fast scaffold are ingeniously designed and their dimensions meet all building standards

    The unilateral scaffold is 0.73m wide and can be placed on most 0.8m and 1.2m escalators

    It can be operated by 2 people, which is convenient and fast

    Simple combination, which can be built into various types of fast scaffold platforms for using on steps

    Compared with traditional ladders, it is safer and more efficient


In modern buildings, especially in some shopping malls, hotels and public spaces of government livelihood projects (theaters, stadiums, libraries, conference centers, etc.), the upper part of most rolling ladders is a large space, with a large number of lamps, cleaning, advertising and other works. The traditional ladder has a low safety factor, which is time-consuming and labor-intensive.

The INSTANT stair case solution adopts universal aluminum alloy scaffold components, which through ingenious combination and matching, can be built into a quick installation scaffold platform that meets the needs of on-site work.

The width of unilateral scaffold is 0.73m, which can be placed on most 0.8m and 1.2m escalators. The assembly is simple, fast, safe and efficient.

斜梯组合用.jpg

 2.  high mobile aluminum alloy scaffold tower

PAN400 cold pressure type high-quality 00 cold\

Assembled with SPAN400 cold pressed high-quality components

-Flexible collocation, can reach up to 40 meters

-Easy to move, usually 3 to 4 people can easily (level ground)

-Below the height of 12-18 meters, the "day" shape structure is generally adopted

-The height of 18-24 meters,generally using the “eye”shape mechanism

-Other heights, according to the need can use the "field" shape structure, pyramid structure, etc

-Often need to add some special parts 


According to the characteristics of aluminum alloy scaffold, according to the design of professional experience and engineering accumulation, the operation platform of super high mobile scaffold is commonly classified as follows:

General hotel, building maintenance and maintenance, working platform using standard design.

Construction class, need to be designed according to the specific type of work, in the system before ensuring safety, we must consider the construction efficiency, the general platform design size is 4m*1.4m,3m*4m,2m*3.8m, 4m * 6m, etc.

For super-high towers, it is necessary to know the site conditions in detail to ensure that  can move freely. Even if there is shelter, it should also be convenient for disassembly and secondary erection.

For general building facilities, mobile aluminum alloy scaffolds with a height of more than 12 meters are very dangerous. According to the European Union EN1004 standard, for mobile working platforms with a height of more than 12 meters, professional companies and engineers must sign and issue design documents and be responsible for the safety and use of products for life.

Therefore, the following factors must be taken into consideration when designing the product scheme:

1) Non professionals can successfully carry out the construction and safe operation of 20 meter high products after simple training;

2) It is very important to reduce the fear of non professionals who are swaying by the tower at a height of 20 meters!

3) Ensure that 2-3 people can easily move the tower;

4) Mobile aluminum alloy platforms above 20 meters are expensive, and the products should have a service life of at least 20 years.


1540208040.jpg


3.

Simple structure and convenient erection, it is an economical, efficient and safe solution

The length of cantilever includes 0.75m, 1.40m, 2.0m

Assembled with standard parts of INSTANT scaffold

It has a strong versatility,which parts can be assembled for tower application at the same time

At least 3 people shall be present during cantilever operation

Counterweight must be loaded

Before erection, the load bearing and counterweight needs must be calculated according to the basic lever principle

Free movement when required


悬臂_副本.jpg


在线客服
Contact Us

Contact Us

分享 一键分享